Yesterday we moved 8 HPC nodes to an alternate rack in order to alleviate pressure on UDC HVAC. The implication for this move is that nodes 608 – 615 are connected to the FHGFS storage via a second Infiniband switch. We will monitor the link in order to ensure that IO to the storage is not saturated.